Mitton Grange

Mitton Grange 7
Project sector
Residential
Project location
Clitheroe
Main contractor
Prospect Homes
Ross

Browse the brick selection

Our brick finder helps you choose the perfect bricks for your project.

  • Mitton Grange 5
  • Mitton Grange 7
  • Mitton Grange 1
  • Mitton Grange 4
  • Mitton Grange 2
  • Mitton Grange 6
  • Mitton Grange 3
01 / 07

    Overview

    Mitton Grange is a prestigious development of 50 new three and four-bedroom homes built within the Ribble Valley (an Area of Outstanding Natural Beauty) on the outskirts of the desirable village of Whalley. The homes have been built to the highest standards are set within an idyllic location, which has made them popular with families as well as buyers looking to downsize and enjoy the ease of a ready-to-use home with excellent energy efficiency.

    This regeneration project is built upon a space previously occupied by boarded up properties and wasteland. The MD for the contractor, Prospect Homes, said, “we are thrilled to be regenerating this piece of land, giving this part of Mitton Road a much-needed facelift and bringing energy efficient homes to Whalley.”

    CPG Building Supplies were proud to provide a selection of products to facilitate this ‘facelift’ including facing bricks, cast stone and prefabricated arches.

    Concept

    The nearby village of Whalley is filled with old cottages and historic buildings dating back to the Tudor and Georgian period. When conceptualising Mitton Grange, the local architecture was thoughtfully considered in order to blend the new development into the existing community. Another factor central to the selling of these homes is the fact that they are nestled in the Ribble Valley, an Area of Outstanding Natural Beauty. All materials were selected to create homes ‘worthy of this unique location’ (Prospect Homes).

    Project Completion

    A high-quality finish was a key factor in the construction of the properties at Mitton Grange and CPG worked with the main contractor, Prospect Homes, to achieve this desired result.

    CPG advised and provided samples of bricks that would complement the buildings within the area. The final bricks chosen were the Ashington Red, Westerton Orange and Durham Claret facing bricks. Once the order was confirmed, the team liaised with the manufacturer to give a comprehensive delivery schedule. This ensured that the bricks were on-site in line with the project’s build programme, were not subject to delays and any rearranged deliveries were promptly dealt with.

    CPG also provided prefabricated brickwork arches from Premium Cutting Services, plus Pendersons Artstone cast stone for the heads and cills. These details not only contributed to the high-end finish, but also complemented the historical local architecture.

    Share on
    CPG ONBLACK LOGO 2019 RGB
    Speak to our team

    Get in touch with our knowledgeable teams, to get the information you need and start your project. Call us on 0161 763 6055 or send us as an email at sales@cpgbs.com